Mike Golding, SVP of Construction at VIRTUS Data Centres, discusses the successful delivery and installation of two 185MVA super-grid transformers at its Wustermark Campus in Berlin/Brandenburg. From the 380kV connections to the deployment of these super-grid transformers, every element has been designed to deliver levels of resilience and scalability that have note previously been available in this region. Mike explains that the campus represents a new generation of infrastructure - one that supports AI-scale growth, reduces reliance on generators, and aligns with the future of renewable energy.